The store will not work correctly when cookies are disabled.

Project Lifecycle (Creative)
In stock
item details (4 Editable Slides)
- Applications Supported: PowerPoint, Google Slides
- File Type: .pptx, Google Slides
- Aspect Ratio:16:9 (Wide Screen)
- Animation: Yes
Sizing Charts
Women
| Size |
XS |
S |
S |
M |
M |
L |
| EU |
32 |
34 |
36 |
38 |
40 |
42 |
| UK |
4 |
6 |
8 |
10 |
12 |
14 |
| US |
0 |
2 |
4 |
6 |
8 |
10 |
| Bust |
79.5cm / 31" |
82cm / 32" |
84.5cm / 33" |
89.5cm / 35" |
94.5cm / 37" |
99.5cm / 39" |
| Waist |
61.5cm / 24" |
64cm / 25" |
66.5cm / 26" |
71.5cm / 28" |
76.5cm / 30" |
81.5cm / 32" |
| Hip |
86.5cm / 34" |
89cm / 35" |
91.5cm / 36" |
96.5cm / 38" |
101.5cm / 40" |
106.5cm / 42" |
Men
| Size |
XS |
S |
M |
L |
XL |
XXL |
| UK/US |
34 |
36 |
38 |
40 |
42 |
44 |
| Neck |
37cm / 14.5" |
38cm /15" |
39.5cm / 15.5" |
41cm / 16" |
42cm / 16.5" |
43cm / 17" |
| Chest |
86.5cm / 34" |
91.5cm / 36" |
96.5cm / 38" |
101.5cm / 40" |
106.5cm / 42" |
111.5cm / 44" |
| Waist |
71.5cm / 28" |
76.5cm / 30" |
81.5cm / 32" |
86.5cm / 34" |
91.5cm / 36" |
96.5cm / 38" |
| Seat |
90cm / 35.4" |
95cm / 37.4" |
100cm / 39.4" |
105cm / 41.3" |
110cm / 43.3" |
115cm / 45.3" |